Design. Engineer. Install. All in-house.
Every G-TEC Recovery Room is delivered by our own engineering and installation team — a complete solution, from the first site survey to the final finish. No subcontractors, no handoffs between trades.
Site Survey & Design
On-site assessment of electrical capacity, water supply and structural load, paired with a 3D concept.
Engineering & Fabrication
Structural, plumbing, electrical and climate systems engineered and fabricated to spec — including 3-phase power for larger installs.
Installation & Build
New-build or full renovation, delivered on-site by our own project and installation team.
Aftercare & Support
Ongoing maintenance, servicing and staff training on every protocol and system.
- Structural & plumbing integration01
- Electrical up to 3-phase, 400V02
- Custom joinery & Hemlock wood finishes03
- Climate & ventilation systems04
- Full facility renovation05
- New-build project management06
Specialists in every trade. On every project.
Renovation or new build, single room or national programme — the same in-house team of specialists sees it through, start to finish.
Structural Engineers
Load, layout and renovation feasibility for any existing or new space.
Electrical Engineers
Up to 3-phase, 400V capacity for the highest-draw recovery systems.
Plumbing & Hydronics
Water supply, drainage and filtration for tubs, saunas and contrast systems.
HVAC & Climate Control
Ventilation and climate systems engineered for heat, steam and cold rooms.
Custom Joinery & Finishing
Hemlock wood and premium finishes, built and fitted by our own craftsmen.
Low-Voltage & Controls
WiFi, touchscreen control and G-TEC TEC platform integration, wired in from day one.
Project Management
One point of contact from first survey to final sign-off, on every timeline.
Site Installation Crews
Our own crews on-site for the full build — not subcontracted, start to finish.